The bottom half of the unit is done, aside from the kickboard. The top half facing has one coat of paint. |
As you can see, it's a huge difference and makes the room quite nice now. |
Got another spot to do some patch/paint on as well as one more coat on the door. |
The same spot needs to be finished and the skirting for the sink needs to be attached. |
I did finally get the last window on this side painted and the screen reattached. |
Started making some progress on here. The most notable thing would be the almost invisible pipes. |
So much better with the pipes painted to match the siding. |
The list of DOOM
Paint the side of the house up to the kitchen window.Paint the kitchen windowand screenFinish last bits of drywall patching- Finish painting the walls in laundry room
- Finish painting the trim in laundry room
- Finish cabinet unit thingy
Paint laundry room ceiling- Organize the shelves with smaller boxes from garage
- Curtains for laundry room
- Curtains for extra bedroom
- Figure out what to do about the basement stair's cover
- "Fix" the cracked tiles with more caulking
- Call Derrick to arrange to have sections that can't be caulked patched with wood.
- See if Derrick can fix the lawn mower
Finalize the budget for October- Patch holes in the patio
- Buy a new lock for back door
- Finish the gigantic pile of mending I have in the other room
No comments:
Post a Comment